Introduction

The Incheon Port International Passenger Terminal was created to develop Incheon Port into an internationally beautiful port for tourism by constructing an international passenger pier and terminal to resolve user inconvenience caused by dual (inner and coastal) operations and increase port operation efficiency. Construction began in December 2016 and was completed in June 2019, and operations began on June 15, 2020. It has a total floor area of ​​66,789.62 ㎡ (terminal building 65,421.15 ㎡, gate building 1,368.47 ㎡) and consists of five floors and a rooftop floor.

🗺 Location

57 , Gukjehangman-daero 326beon-gil, Yeonsu-gu, Incheon

🔎 Information

Inquiries
+82-1599-5985